FSN1-DC14
Started Operating February 1st, 2018
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC15
Started Operating January 22nd, 2020
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC16
Started Operating October 9th, 2020
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC17
Started Operating December 8th, 2021
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC18
Started Operating April 29th, 2021
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
Tuusula/Helsinki
HEL1-DC2
Started Operating March 19th, 2018
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC1
Started Operating August 23rd, 2018
Location Data Center Park Helsinki
Use Colocation
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC3
Started Operating November 25th, 2020
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC4
Started Operating June 11th, 2019
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC5
Started Operating July 11th, 2022
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC6
Started Operating July 12th, 2021
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
Nuremberg
NBG1-DC1 Started Operating April 2nd, 2012
Location Data Center Park Nuremberg
Use Dedicated servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC2 Started Operating September 1st, 2012
Location Data Center Park Nuremberg
Use Colocation, Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC3 Started Operating August 22nd, 2016
Location Data Center Park Nuremberg
Use Currently only Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC4 Started Operating August 1st, 2016
Location Data Center Park Nuremberg
Use Colocation
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC5 Started Operating March 27th, 2020
Location Data Center Park Nuremberg
Use Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
Falkenstein/Vogtland
FSN1-DC1 Started Operating June 2nd, 2009
Location Data Center Park Falkenstein
Use Dedicated servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC2
Started Operating February 26th, 2010
Location Data Center Park Falkenstein
Use Colocation and dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC3
Started Operating May 4th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC4
Started Operating August 30th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC5
Started Operating December 7th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC6
Started Operating July 28th, 2011
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC7
Started Operating February 28th, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC8
Started Operating May 1st, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC10
Started Operating November 15th, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC11
Started Operating August 30th, 2013
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC12
Started Operating May 5th, 2014
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC13
Started Operating December 21st, 2016
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
если бы покупка райзен 5 окупалась за пол года
а покупка райзен 9 окупалась за 2 года
да, разница ощутима
но когда разница в цене всего 3 месяца
это нонсен какой-то
зачем изначально повышать цену на самый мощный процессор и тем самым терять половину возможных клиентов у которых не хватило бы денег?
Да там не дело в тупом копировании, а в выстраивании структуры. Переключить >20 доменов, которые не начинают работать сразу, а только когда обновится DNS, обновить IP сервака на внешних сервисах, построить ту же файловую структуру, настроить весь необходимый софт, правильно перетащить все базы, чтобы всё заработало из коробки, накатить ssl, перетащить тяжелую файлуху, и сделать это нужно так, чтобы клиенты не заметили переезда. А, как это обычно и бывает, с первого раза далеко не всё заводится, особенно с учётом того, что я переезжаю с Ubuntu 16 на Ubuntu 22, и обновляю проекты некоторым из которых по 6+ лет.
А это ёбнуться какая непростая задача для одной недели.
нам с тобой не повезло, что работу с IP адресами — отдали абсолютно неграмотному сотруднику. который сделал повышение цен просто через анальное отверстие. если бы была возможность я продлил только нужные и ничего бы менять не пришлось, но продлить только конкретные нельзя оказалось.
сразу чувак(ты) отписался который тупо не переезжал, а значит в теории скорее всего проебал бы свои данные
Да я всю неделю переезжал, занимаясь этим ежедневно, вместо работы. Там дохера всякой мелочи, перетащить которую в один день просто невозможно, это длительный процесс, нужно перенастроить всю структуру, которую я несколько лет строил.
совсем не ожидаешь, что сервер потушится 13го декабря.
это я потушил
чтобы проверить как раз «перехал чел или не переехал»
чтобы потом не было ой я проебал данные
и как оказалось я сделал правильно — сразу чувак(ты) отписался который тупо не переезжал, а значит в теории скорее всего проебал бы свои данные
один чел уже проебал данные — 13 дней, каждый божий день звонит им на телефоны и хочет бекап выкачать
его посылают из одного дела в другой и так далее по кругу
я со своей стороны сделал что мог — предупредил заранее
и выдал новые ВДС с новых нод, притом которые стоят дороже, но оставил этим 4м челам цены старые, себе в убыток
так что советую переехать поскорее
возможно IP отключатся 14 числа, а может быть и нет — ХЗ
я знаю что этому серверу пизда, вот это я знаю
чудо что он до сих пор работает
хотя да, он оплачен по январь 2023
но IP не оплачены и не будут оплачены
если кратко
то это очень старая нода
на ней было 200 IP всякого мусора — цена которых 20000р/мес
а людей на ноде осталось по старым ценам притом еще, я не менял цены — короче там 4 человека которые платят 3900р
3900р vs 20000р/мес
выбор — закрыть сервер очевиден
Да если бы я знал, когда этот последний день настанет, гораздо проще было бы жить. После фразы «сервер оплачен до января, когда закончатся IP я не знаю» совсем не ожидаешь, что сервер потушится 13го декабря.
Да и переезд сервера не такая простая задача, я только кэш картинок два дня выкачивал.
почему так мало контактов связи с тобой?
ну вк/дс/ватцап выложил бы чтоль?
Started Operating February 1st, 2018
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC15
Started Operating January 22nd, 2020
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC16
Started Operating October 9th, 2020
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC17
Started Operating December 8th, 2021
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC18
Started Operating April 29th, 2021
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
Tuusula/Helsinki
HEL1-DC2
Started Operating March 19th, 2018
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC1
Started Operating August 23rd, 2018
Location Data Center Park Helsinki
Use Colocation
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC3
Started Operating November 25th, 2020
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC4
Started Operating June 11th, 2019
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC5
Started Operating July 11th, 2022
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
HEL1-DC6
Started Operating July 12th, 2021
Location Data Center Park Helsinki
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC1
Started Operating April 2nd, 2012
Location Data Center Park Nuremberg
Use Dedicated servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC2
Started Operating September 1st, 2012
Location Data Center Park Nuremberg
Use Colocation, Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC3
Started Operating August 22nd, 2016
Location Data Center Park Nuremberg
Use Currently only Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC4
Started Operating August 1st, 2016
Location Data Center Park Nuremberg
Use Colocation
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
NBG1-DC5
Started Operating March 27th, 2020
Location Data Center Park Nuremberg
Use Dell servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
Falkenstein/Vogtland
FSN1-DC1
Started Operating June 2nd, 2009
Location Data Center Park Falkenstein
Use Dedicated servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC2
Started Operating February 26th, 2010
Location Data Center Park Falkenstein
Use Colocation and dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC3
Started Operating May 4th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC4
Started Operating August 30th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC5
Started Operating December 7th, 2010
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC6
Started Operating July 28th, 2011
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC7
Started Operating February 28th, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC8
Started Operating May 1st, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC10
Started Operating November 15th, 2012
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC11
Started Operating August 30th, 2013
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC12
Started Operating May 5th, 2014
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
FSN1-DC13
Started Operating December 21st, 2016
Location Data Center Park Falkenstein
Use Dedicated root servers
Facilities Uninterruptible power supplies (N+1 redundant UPS)
2.5 MVA diesel generator
Power supply via two separate power paths from the substation to the low-voltage distribution
обработчики или что-то еще невозможно разделить
поэтому только я как главный админ — сам делаю вручную для каждого хостинга и кроме меня нету доступов
а вот что на скрине — это делится легко и не пересекается
потом они вернули, но я уже не буду ничего возвращать, они сделали свой выбор
вечных у меня тоже не осталось все давно раздал пустых нет
могу только в корпоратив себе бесплатно добавить
а покупка райзен 9 окупалась за 2 года
да, разница ощутима
но когда разница в цене всего 3 месяца
это нонсен какой-то
зачем изначально повышать цену на самый мощный процессор и тем самым терять половину возможных клиентов у которых не хватило бы денег?
А это ёбнуться какая непростая задача для одной недели.
нам с тобой не повезло, что работу с IP адресами — отдали абсолютно неграмотному сотруднику. который сделал повышение цен просто через анальное отверстие. если бы была возможность я продлил только нужные и ничего бы менять не пришлось, но продлить только конкретные нельзя оказалось.
я тоже люблю строить проекты которые по 10 лет работают «пока не сгорят»
я так и планировал — сервер бы работал пока не сгорит
если бы не ОВХ с своим изменением цен на IP адреса
на базе ОВХ миграции сделать невозможно к сожалению.
50 ГБ через rsyns перекачать вроде не так сложно
или ты ftp используешь?
чтобы проверить как раз «перехал чел или не переехал»
чтобы потом не было ой я проебал данные
и как оказалось я сделал правильно — сразу чувак(ты) отписался который тупо не переезжал, а значит в теории скорее всего проебал бы свои данные
один чел уже проебал данные — 13 дней, каждый божий день звонит им на телефоны и хочет бекап выкачать
его посылают из одного дела в другой и так далее по кругу
и выдал новые ВДС с новых нод, притом которые стоят дороже, но оставил этим 4м челам цены старые, себе в убыток
так что советую переехать поскорее
возможно IP отключатся 14 числа, а может быть и нет — ХЗ
ОВХ с 1 декабря багает
можешь почитать
hosting.show/tag/%D0%B1%D0%B0%D0%B3%D0%B8/
я знаю что этому серверу пизда, вот это я знаю
чудо что он до сих пор работает
хотя да, он оплачен по январь 2023
но IP не оплачены и не будут оплачены
если кратко
то это очень старая нода
на ней было 200 IP всякого мусора — цена которых 20000р/мес
а людей на ноде осталось по старым ценам притом еще, я не менял цены — короче там 4 человека которые платят 3900р
3900р vs 20000р/мес
выбор — закрыть сервер очевиден
Да и переезд сервера не такая простая задача, я только кэш картинок два дня выкачивал.